All articles
Revenue cycleSeptember 18, 2026

How to cut days in A/R below 40, and keep it there

Days in accounts receivable is the metric every practice quotes and few can move. The fix is rarely working the queue harder. It is finding the three places the clock is quietly running.

C
CollaboratMD
Revenue cycle notes
7 min read

Days in accounts receivable measures how long revenue sits uncollected after the visit. The industry target is under 40 days, and most practices that miss it do not miss it by a little. They sit at 55, 60, sometimes past 70, and the explanation offered is almost always the same: the payers are slow.

Payers are slow. They are also consistent. Medicare pays on a schedule you can set a watch by, and the large commercial plans are not far behind. When a practice runs at 60 days against payers that adjudicate in 18, the delay is not coming from the payer. It is coming from the three gaps on either side of them.

Gap one: the lag before submission

The A/R clock starts at the date of service, not at the date you submit. Every day a charge waits in a drafts queue is a day of aging that no payer caused and no collections effort can recover. It is also the cheapest day to eliminate.

Measure the interval between date of service and submission date, and measure it as a distribution rather than an average. The average hides the problem. What matters is the tail: the 5% of claims that sit for two weeks because a coder had a question nobody answered, or because a provider had not signed the note.

  • Track the oldest claim in the ready queue as a standing number, not a report you run monthly.
  • Set a hard rule that nothing sits in drafts past 48 hours without an owner and a reason.
  • Route unsigned notes to the provider daily, not weekly. A note that blocks a claim is a financial document.

Gap two: the rework loop

A claim that is rejected by the clearinghouse or denied by the payer does not restart the clock. It keeps aging while somebody figures out what went wrong, corrects it and resubmits. A single rework cycle typically adds 14 to 21 days.

This is why clean claim rate and days in A/R move together, and why chasing the second without fixing the first is wasted effort. If 12% of your claims need rework, roughly one claim in eight is carrying an extra three weeks of age, and that alone will hold the practice above 45 days no matter how well the follow-up team performs.

A denial found three weeks later costs a phone call, an appeal and a month of aging. The same error found before submission costs ten seconds.

The highest-return work here is unglamorous. Take the denial reasons from the last quarter, rank them by dollars, and turn the top five into validation rules that fire at charge entry. Missing or invalid diagnosis pointers, place of service contradicting the procedure, a modifier the payer does not accept on that code, an NPI that fails its check digit: all of these are knowable before submission.

Gap three: the balance nobody owns

After the payer adjudicates, part of the balance transfers to the patient. In many practices that transfer is where aging goes to hide, because insurance A/R and patient A/R are reported as one number. Insurance receivable resolving in 22 days and patient receivable resolving in 90 average out to something that looks acceptable and is not.

Separate them. Report insurance A/R and patient A/R as distinct figures with distinct targets, and give patient balances their own workflow: an estimate collected at check-in, a statement that follows the patient-friendly format, and a defined escalation path. Practices that split the two almost always discover the insurance side was healthier than they thought and the patient side was worse.

What good looks like

MetricTargetWhy it matters here
Date of service to submissionUnder 3 daysPure aging you control completely
Clean claim rate95% or betterEvery rework cycle adds 14 to 21 days
Days in A/R, insuranceUnder 35 daysMeasures payer cycle plus your follow-up
Days in A/R, patientUnder 45 daysHidden inside a blended figure
A/R over 90 daysUnder 15%The tail that rarely gets collected

Work the three gaps in order and the headline number falls without anyone working longer hours. Submission lag is the fastest to fix, rework is the largest in dollars, and the patient balance split is the one that stops the number drifting back up six months later.

The measurement trap

One last warning, because it catches more practices than any of the above. Days in A/R is normally computed as ending receivable divided by average daily charge. If the denominator uses a 12-month average while the practice has grown, the metric flatters you. If it uses a 30-day window during a slow month, it punishes you. Pick a 90-day average daily charge, document the choice, and stop changing it. A metric you can move by changing its formula is not a metric.

See these numbers on a full-size demo practice

The demo runs on a synthetic practice of 100 providers, 15,000 patients and 105,000 claims, scrubbed, submitted, adjudicated by a simulated payer, denied and appealed.

Open the demo